Building

A deeply rooted project management background allowed us to actualize a challenging project, chasing every single step thanks to a complete and integrated management of authorizations and planning progress.

The construction of an industrial building into a contaminated area with a remediation process ongoing and simultaneously affected by a concrete rockfall risk could seem an extremely difficult idea to make real, but, thanks to the synergy between our working groups we got successful to contemporary manage both managerial and planning commitment, getting the whole area free of any environmental and geological hurdles, while a third team was focused on the building project.

Our qualifications

Linked projects

Visit to the Brenner Base Tunnel: Mules 2-3 lot

The Zulberti Srl team visited the Brenner Base Tunnel (BBT) construction site

The Georadar

Reinforced soil is a natural engineering technique widely used in recent years. This method allows us to strongly limit environmental impact, by replacing traditional reinforced concrete walls with structures capable of greening the slope.

PFAS contamination: MITENI case study

PFAS are compounds that have a negative impact on the environment. Since 2021 ZULBERTI S.r.l. deals with the environmental monitoring of the MITENI Site, carrying out works that limit its effects on the environment.